ENGINEERING CHALLENGES,
RELIABLE SOLUTIONS
EarthTech develops retaining wall and reinforced soil solutions that address complex site conditions, structural loading, construction constraints, and long-term performance.
01
Two-Staged Solution
For settlement-sensitive walls built in phases.
02
True Abutment
Built up to 11.76m tall, proven reliability on TransCanada Highway.
03
Waterfront
Special design in salted water, and shoreline adjacent structures.
ENGINEER
The Challenges
EarthTech evaluates project-specific demands and tailors each retaining wall solution around engineering risk, site access, soil behavior, and construction sequencing.
Extreme Loading
Narrow Wedge Reinforcement
Seismic & Extreme Weather
Differential Settlement
Extreme Loading
Bridge structures, highways, rail corridors, and industrial facilities create significant surcharge (240kPa) demands on retaining systems. EarthTech offers reliable retaining wall solutions for extreme loads while maintaining long-term structural performance.
Narrow Wedge Reinforcement
EarthTech turns sheet pile, soil nail, gravity, or soft ground into innovative MSE retaining wall systems in confined space or existing slope while maintaining constructability and structural reliability.
Seismic & Extreme Weather
Reliable mechanical connection enhances retaining systems to perform under seismic activity, flooding, freeze-thaw cycles, and extreme weather conditions. Solutions are developed to improve resilience, durability, and long-term infrastructure reliability.
Differential Settlement
Soft ground and varying soil behavior can lead to differential settlement and structural movement. EarthTech applies flexible reinforced soil systems and staged retaining wall solutions to accommodate settlement while protecting long-term performance.
BUILDABLE RESPONSE
EarthTech Solutions
These solutions are developed in response to the engineering challenges above. Each option connects a specific site constraint to a buildable retaining wall strategy, helping the project move from risk assessment to practical construction.
Extreme Loading
Heavy haul structures transferring extreme vertical and lateral loads from bridges, traffic, equipment, and industrial operations.
Patented retaining wall solutions for bridges, highways, rail corridors, and industrial facilities where heavy surcharge loads are a key challenge. The e-Wire system was engineered to safely support 240kPa through project-specific design, reinforced retaining systems, and proven construction methods while maintaining long-term structural performance
• Customized engineering for high loading conditions
• Bending flexible polyester grid to increase sliding resistance
• Low creep and minimized connection gap
• Integrity performance and stability
• Customized engineering for high loading conditions
• Bending flexible polyester grid to increase sliding resistance
• Low creep and minimized connection gap
• Integrity performance and stability
Narrow Wedge Reinforcement
Back-to-back connection against confined space to balance sliding through a key and overturning through back structure gravity.
For projects with limited construction space, EarthTech customized a creative solution taking advantage of polyester grid flexibility to achieve the required FoS within restricted footprints. Site-specific engineering improves constructability while maintaining structural stability for bridge and transportation projects.
• Balance the wall through connecting to the existing structure
• Site-specific engineering design
• Combine MSE and gravity wall for stability
• Improve the constructability and performance
• Balance the wall through connecting to the existing structure
• Site-specific engineering design
• Combine MSE and gravity wall for stability
• Improve the constructability and performance
Seismic & Extreme Weather
Reliable mechanical connection, tailored length combination with lightweight fill for wall or slope stabilization demands.
Customized wall or slope solutions perform reliably against landsliding, seismic, heavy rainfall, waterfront, engineering constraints and site conditions.
• Designed for demanding site conditions
• Creative engineering solutions
• Reliable mechanical connections
• Long-term infrastructure reliability
• Designed for demanding site conditions
• Creative engineering solutions
• Reliable mechanical connections
• Long-term infrastructure reliability
Differential Settlement
Manage differential settlement through foundation design, creating a flexible platform that helps the foundation settle together.
A creative solution for projects with variable foundation conditions and settlement concerns. Feel free to contact us for a complimentary concept or project-specific design to address your engineering challenge.
• Back-to-back reinforced flexible foundation
• Balanced load distribution
• Enhanced structural stability
• Long-term foundation performance
• Back-to-back reinforced flexible foundation
• Balanced load distribution
• Enhanced structural stability
• Long-term foundation performance
Featured Projects
Woodfibre LNG
21.5m high, with both e-Panel and e-Wire systems with 200kPa surcharge loading
Calgary Ring Road
As the authorized Tensar ARES system distributor, tracking back to 2007 for Calgary Ring Road project with reliable engineering performance.
Sharkbite Heavy Haul Bridges
The e-Wire system was used for the World’s Widest Bridge (73.5m) with 102kPa live load, vertical along the curvert, over 10.5m tall
BC Flood Recovery Project
EarthTech supports global emergency flood and landsliding reconstruction with quick turnaround and reliable solutions.
USE CASES
Application
EarthTech solutions support transportation, municipal, industrial, commercial, mine heavy haul, and residential retaining wall applications.
△
Transport
Ⅲ
Municipal
▦
Industrial
◉
Commercial
≈
Mine Heavy Haul
⌂